![]() “So, there’s an internal coordination that happens throughout the design review process, making sure that things like mechanical duct is not too low for the ceiling height that was intended for the space.” “A big part of the design review process is making sure that there aren’t any conflicts that would affect the entire design of the building,” said Jeanette Popiel, a product manager at Bluebeam and a former architect. ![]() The workflow is also used to make sure that everything within the building’s plans is fully coordinated through all of the different stakeholder contributions to the project. ![]() This is when all stakeholders of a project - owner, architect, mechanical, electrical and structural engineers, plumber, etc.-convene to look over all the plan documents to make sure that what’s included in the plans matches the requirements for the building. Design review is one of the most critical stages of a construction project.